Alpha Pacific Systems Pvt Ltd: civil and hydro-mechanical works, automation, power, buildings and roads.
Maneri, Uttarkashi · Ongoing · Civil & Hydro-Mechanical
Alpha Pacific Systems Pvt Ltd is executing the energy dissipating arrangement at Maneri Bhali Stage I under the DRIP II programme.
The works include stilling basin reconstruction, extended training walls and left-bank slope stabilisation downstream of Maneri Dam in Uttarkashi.
Bambolim, North Goa · Awarded · Buildings & Roads
Alpha Pacific Systems Pvt Ltd has secured a contract from the Government of India’s Ministry of Ports for an administrative and residential campus at Bambolim, North Goa.
The development brings together an administrative building, six residential blocks, building services and campus infrastructure.
Balutar, Sikkim · Awarded · Buildings & Roads
Alpha Pacific Systems Pvt Ltd has been awarded a contract to construct six store sheds at NHPC Teesta V, on the left bank at Balutar, Sikkim.
The scope adds storage facilities to the hydropower project colony. The contract period is 12 months.
Kanupur Irrigation Project · Ongoing · Automation & Power
Centralised remote control and spillway gate automation for the OCCL Kanupur Irrigation Project.
The scope covers SCADA control for the gate automation system.
Kharamukh · Ongoing · Civil & Hydro-Mechanical
TRCM protection steelwork at NHPC Chamera III, Kharamukh, under package WC-386.
Sikkim · Ongoing · Civil & Hydro-Mechanical
Left-bank dam slope protection works at NHPC Teesta V in Sikkim.
Himachal Pradesh · Completed · Civil & Hydro-Mechanical
Dam complex, headrace tunnel and diversion-cum-desilting tunnel civil works under Package C-1 at Baira Siul Power Station. Completed in July 2021.
Uttarakhand · Completed · Civil & Hydro-Mechanical
Wing-wall civil works and renovation of gates 1–2 at Joshiyara Barrage, Uttarakhand.
Uttarakhand · Completed · Civil & Hydro-Mechanical
Wing-wall works on both banks and renovation of gates 1–3 at Maneri Dam, Uttarakhand.
Maneri Bhali-II · Completed · Civil & Hydro-Mechanical
Hill-slope protection works at the Dharasu surge shaft, Maneri Bhali II, for UJVN.
Uttarakhand · Completed · Civil & Hydro-Mechanical
Rehabilitation works across five packages at NHPC Dhauliganga Power Station, Uttarakhand.
Tanakpur Barrage · Completed · Civil & Hydro-Mechanical
Stilling basin repairs in bays 15–18 at NHPC Tanakpur Barrage.
Parbati HE Stage-II · Completed · Civil & Hydro-Mechanical
Pancha Trench Weir and feeder tunnel civil works for Parbati HE Stage II under Package C-547A. Completed in April 2022.
Rangit-IV HEP · Completed · Civil & Hydro-Mechanical
Alpha Pacific Systems Pvt Ltd completed the Rangit IV HEP RRT civil works under Package 5 in January 2026.
The scope included slope protection, steel liner and anchoring works.
Sikkim · Completed · Civil & Hydro-Mechanical
Spillway steel liner works in bays S-2, S-4 and S-5 at NHPC Teesta V, Sikkim.
Pithoragarh, Munsiyari & Bageshwar · Completed · Buildings & Roads
Four PWD motor-road contracts across Pithoragarh, Munsiyari and Bageshwar.
Lohiahead · Completed · Buildings & Roads
Colony road works at Lohiahead for UJVN.
HVPNL Package G-13B · Completed · Buildings & Roads
Civil works for the 132/33 kV substations at Batta and Padla under HVPNL Package G-13B, for IL&FS.
Tiloth PS · Completed · Automation & Power
Auxiliary equipment and cooling-water tank works at Tiloth Power Station for UJVN.
Khodri PS · Completed · Automation & Power
Operation and maintenance of the 33/132 kV substation and 11 kV panels at Khodri Power Station.
Dharasu PS · Completed · Automation & Power
Six months of hydro-mechanical and electrical/mechanical maintenance at Dharasu Power Station.
Himachal Pradesh · Completed · Automation & Power
220 V DC battery-bank works at Baira Siul Power Station, covering 500 Ah and 100 Ah banks.
Dakpathar, Asan, Virbhadra & Joshiyara · Completed · Automation & Power
SCADA control, monitoring and annual maintenance for the barrages at Dakpathar, Asan, Virbhadra and Joshiyara.
Koteshwar HE Project · Completed · Automation & Power
Reservoir level-sensing instrumentation at THDC Koteshwar Hydroelectric Project.
Karnataka · Completed · Automation & Power
SCADA systems for the Upper Tunga and Markandeya projects in Karnataka, for KNNL.
Som Kamla Amba, Chhapi & Dholpur · Completed · Automation & Power
SCADA systems for the Water Resources Department at Som Kamla Amba, Chhapi and Dholpur in Rajasthan.
Odisha · Completed · Automation & Power
Cloud-based control and automation systems for OCCL at the Lower Suktel and Deo projects in Odisha.
Parbati-II, Teesta-V, Dulhasti & Rangit · Completed · Automation & Power
Automatic water-level recording, early warning and discharge monitoring systems for NHPC projects at Parbati II, Teesta V, Dulhasti and Rangit.
Rishikesh to Dehradun · Completed · Automation & Power
Relocation of UJVN servers from Rishikesh to Dehradun.
Loktak PS & Bhadrabad, Roorkee · Completed · Automation & Power
On-grid solar EPC works at Loktak Power Station and Bhadrabad, Roorkee, covering survey, installation and commissioning.
Dakpathar · Completed · Buildings & Roads
Civil works for an RCC-framed, five-storey control building and GIS block at Vyasi HEP in Dakpathar for UJVN Ltd.
Completed in February 2022.